MétaCan
Menu
Back to cohort
Record W632573533

Giving the city back to the people

2006· article· en· W632573533 on OpenAlexaboutno aff
S Roeed

Bibliographic record

VenueTRA - TRANSPORT RESEARCH ARENA EUROPE 2006: GOETEBORG, SWEDEN, JUNE 12TH-15TH 2006: GREENER, SAFER AND SMARTER ROAD TRANSPORT FOR EUROPE. PROCEEDINGS · 2006
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
Fundersnot available
KeywordsPort (circuit theory)Plan (archaeology)Quarter (Canadian coin)EngineeringCivil engineeringBusinessTransport engineeringArchaeologyHistory
DOInot available

Abstract

fetched live from OpenAlex

The change into a modern and efficient port has liberated large spaces, making it possible to plan a new quarter in Oslo. At present, the motorway that runs along the fringes of the dock area acts as a barrier between the city and the fjord, and this must be re-routed before urban development can take place. A number of private companies and public sector bodies have carried out a comprehensive planning process. In parallel with this process, contracts have been drawn up, which lay down responsibility for financing and ownership conditions once the development structure has been decided. Based on this, the Public Roads Administration has now commenced upon a road project in the heart of Oslo, which also includes Norway's first immersed tunnel. The total cost framework for the project is NOK 4,600 million, and the construction period will stretch over 7 years. The project will be completed in 2012. This is a project facing great technical and practical challenges, and is somewhat of a jigsaw puzzle if the surrounding areas are to suffer as little as possible during the construction period. Currently, main roads, and railway lines pass through the construction site, and the port activities must also proceed as normal. The construction site lies in what was Oslo's cradle 1,000 years ago, offering a number of archaeological challenges, and there has been industry in the port for 300 years, meaning that large volumes of polluted soil must be excavated and handled in an adequate manner. The main goal of the project was to prepare the way for the development of a new and futureoriented district that meets its inhabitants' needs and interests, at the same time as providing an efficient and safe highway system (A). For the covering abstract of the conference see ITRD E212343.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.003
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Other · Consensus signal: Other
Teacher disagreement score0.148
Threshold uncertainty score0.494

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.003
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0100.007
Scholarly communication0.0110.007
Open science0.0010.014
Research integrity0.0030.005
Insufficient payload (model declined to judge)0.1480.061

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.025
GPT teacher head0.253
Teacher spread0.227 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2006
Admission routes1
Has abstractyes

Explore more

Same venueTRA - TRANSPORT RESEARCH ARENA EUROPE 2006: GOETEBORG, SWEDEN, JUNE 12TH-15TH 2006: GREENER, SAFER AND SMARTER ROAD TRANSPORT FOR EUROPE. PROCEEDINGSSame topicBIM and Construction IntegrationFrench-language works237,207