MétaCan
Menu
Back to cohort
Record W644720902

Disraeli Bridges Project

2013· article· en· W644720902 on OpenAlexaboutno aff
Eslam M. Shehata, R Haldone-Wilsone, M Buckberger, B Neirinck

Bibliographic record

Venue2013 CONFERENCE AND EXHIBITION OF THE TRANSPORTATION ASSOCIATION OF CANADA - TRANSPORTATION: BETTER - FASTER - SAFER · 2013
Typearticle
Languageen
FieldEngineering
TopicStructural Engineering and Vibration Analysis
Canadian institutionsnot available
Fundersnot available
KeywordsEngineeringBridge (graph theory)Work (physics)Civil engineeringTransport engineeringProject management
DOInot available

Abstract

fetched live from OpenAlex

The City of Winnipeg identified that there was a need for a major rehabilitation or replacement of the existing Disraeli Bridges (Red River Bridge and the CPR Overpass). The City conducted a value for money study over the proposed design life and determined that it was in their best interest to procure the work in the form of a Design Build Finance and Maintain (DBFM) agreement. The Plenary Roads Winnipeg (PRW) Team, comprised of Plenary, PCL, and Tetra Tech, was the preferred DBFM team. The design was developed in a collaborative manner with the construction and maintenance teams to ensure that the design met the intent of the bid and long-term performance objectives. Life cycle decisions were very important during the design development. Value engineering was conducted at all stages of the project development. This provided the City with the best plan for the project with the least impact to the public in terms of traffic and cost, and to the environment. The PRW team developed a construction plan that allowed for completion of the replacement of all the roadwork and bridge structures without any shut downs during business days, maintaining operational traffic. Geotechnical and environmental challenges included dealing with contaminated south riverbank soils and slope stability of the north riverbank. Construction of the new bridges began in spring of 2010. The Red River Bridge and CPR Overpass were officially opened on October 19, 2012. For the covering abstract of this conference see ITRD record number 201310RT334E.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Other · Consensus signal: Other
Teacher disagreement score0.680
Threshold uncertainty score0.636

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.002
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0030.001
Scholarly communication0.0040.001
Open science0.0010.004
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0320.006

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.007
GPT teacher head0.180
Teacher spread0.173 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2013
Admission routes1
Has abstractyes

Explore more

Same venue2013 CONFERENCE AND EXHIBITION OF THE TRANSPORTATION ASSOCIATION OF CANADA - TRANSPORTATION: BETTER - FASTER - SAFERSame topicStructural Engineering and Vibration AnalysisFrench-language works237,207