MétaCan
Menu
← Back to cohort
Record W7001889755

Letter of the Montreal harbour commissioners to the Hon. Thomas J.J. Loranger, on the proposed improvements in the harbour of Montreal.

2014· article· en· W7001889755 on OpenAlexaboutno aff

Bibliographic record

VenueQSpace (Queen's University Library) · 2014
Typearticle
Languageen
FieldSocial Sciences
TopicCanadian Identity and History
Canadian institutionsnot available
Fundersnot available
KeywordsHarbourGovernment (linguistics)Port (circuit theory)Channel (broadcasting)
DOInot available

Abstract

fetched live from OpenAlex

184*7, when, for reasons that it is unnecessary now to mention, the work was abandoned.In 1850, the Harbour Commissioners, impressed with the importance of these improvements, and impressed also with a full sense of the difficulties to be overcome in connexion with them, asked the Government for power to carry on these improvements.This power was granted, and the necessary legislative provisions made.In two years the Channel of Lake St. Peter was deep- ened to an extent of two feet more than in the old channel.In three years more it was further deepened, so as to give five feet more water than in the old channel ; and the Commission- ers expect this summer to prove that its capacity is increased to seven feet in depth over the old channel.The magnitude of the work will be seen, when it is considered that the deepening extends over a distance of eighty miles, and dredging has actually been done over twenty-four miles, the width of the channel dredged being nowhere less than 300 feet, and that about 4,250,000 cubic yards of excavation have been removed from the bed of the Lake and River, and carried off and dropped at distances averaging more than a mile.These results are adverted to as the best proof of the correct- ness of the views entertained by the Commissioners, of the neces- sity and propriety of improvements being made in the Harbour of Montreal, on a scale corresponding with the magnitude and necessities of the navigation below the city, and with the resources of the great West.Every year's experience shews more conclusively that Harbour improvements on such a scale are necessary, and that without them, the expenditure in the channel below will be almost wholly useless.Impressed with these convictions, the Commissioners, in December 1851, authorized Messrs. Gzowski & KeeJer, Engineers, to survey and report upon the best means of providing such improvements, and especially to ascertain whether it was practicable to connect the Lachine Canal with Hochelaga Bay.Thes3 Engineers reported against the latter project, and suggested, as a better means of giving increased facilities, sundry improvements, including the enclosing of that part of the St. Lawrence from the entrance of the Lachine Canal to Point St. Charles.This scheme of docks at Point St. Charles was approved by the then Harbour Commissioners (Messrs.Try, Marchand and Young), but was then, as now, opposed by a large number of the citizens in the eastern section of the city.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.010
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Other · Consensus signal: none
Teacher disagreement score0.097
Threshold uncertainty score0.216

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.010
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0010.001
Science and technology studies0.0160.003
Scholarly communication0.0050.002
Open science0.0020.002
Research integrity0.0090.010
Insufficient payload (model declined to judge)0.0640.011

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.006
GPT teacher head0.175
Teacher spread0.169 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2014
Admission routes1
Has abstractno

Explore more

Same venueQSpace (Queen's University Library)→Same topicCanadian Identity and History→French-language works237,207→