MétaCan
Menu
Back to cohort
Record W7024147280

QuickZone: Case Study Snapshot #4: Justifying the Additional Cost of Night Work in Nova Scotia

2005· other· en· W7024147280 on OpenAlexaboutno aff

Bibliographic record

VenueRosa P: A digital library for transportation research (United States Department of Transportation) · 2005
Typeother
Languageen
FieldChemistry
TopicSpectroscopy and Laser Applications
Canadian institutionsnot available
Fundersnot available
KeywordsWork (physics)Context (archaeology)LimitingIntersection (aeronautics)Synchro
DOInot available

Abstract

fetched live from OpenAlex

In 2001, the intersection of Reeves Street and Trunk 4 in Port Hawkesbury, Nova Scotia— along a key access route to the Trans Canada Highway—was slated to be upgraded. Both roads are generally two-lane roads with certain sections upgraded to include designated turn lanes. Average annual daily traffic (AADT) through the intersection is roughly 8,000 vehicles per day with approximately 10 percent truck volume. Truck traffic is concentrated during the daytime on weekdays. Most of the traffic volume at this location in Port Hawkesbury is through-traffic continuing on to some of the industrial centers near the town or to points further north. The reconstruction involved a major upgrade of the intersection including additional dedicated turn lanes to accommodate higher traffic volumes and to improve safety. Construction was slated to take place only during daylight hours because of cost and safety concerns. However, it was also evident that any construction during the day would have an impact on motorists. QuickZone Version 1.0 was used to test alternate strategies, including the possibility of a detour route through a residential district. Under the original traffic control plan, the intersection operated 24 hours a day, 7 days a week. Under these conditions, QuickZone predicted up to a 6.5-kilometer (4.1-mile) queue and 70 minutes of delay. Project engineers noted that queues and delays did not form during the overnight hours on any day, especially Friday. They also tested a scenario that eliminated construction during daylight hours on Fridays and Saturdays. Using this information, construction was planned for mornings and evenings during weekdays. This approach cut in half the queuing and the delays associated with the construction. In addition, the number of vehicles on the detour route was reduced to 6,000 vehicles per week, a 40 percent reduction. The QuickZone analysis allowed project engineers to better plan the construction schedule and make the decision to perform some of the most disruptive phases of construction at night.\n

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow), Insufficient payload (model declined to judge)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Dataset · Consensus signal: Dataset
Teacher disagreement score0.185
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0010.002
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0010.000
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0290.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.040
GPT teacher head0.325
Teacher spread0.285 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designNot applicable
Domainnot available
GenreDataset

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2005
Admission routes1
Has abstractyes

Explore more

Same venueRosa P: A digital library for transportation research (United States Department of Transportation)Same topicSpectroscopy and Laser ApplicationsFrench-language works237,207