MétaCan
Menu
Back to cohort
Record W7061730461

RER: lecciones aprendidas y futuro del proyecto

2024· article· es· W7061730461 on OpenAlexaboutno aff

Bibliographic record

VenueRepositorio Digital Institucional de la Universidad de Buenos Aires (Universidad de Buenos Aires) · 2024
Typearticle
Languagees
FieldEngineering
TopicAdvanced Power Generation Technologies
Canadian institutionsnot available
Fundersnot available
KeywordsMetropolitan areaOrder (exchange)Quarter (Canadian coin)Period (music)
DOInot available

Abstract

fetched live from OpenAlex

La Red de Expreso Regional (RER) es el proyecto de infraestructura para la movilidad metropolitana más rentable del Área Metropolitana de Buenos Aires (AMBA). Fue propuesto por el Estudio Preliminar de Transporte de la Región Metropolitana (EPTRM) en 1973. Durante medio siglo hubo varias versiones para su planificación hasta que, en 2016, comenzaron a realizarse las obras previas. Entre ellas, tres viaductos ferroviarios en la Ciudad de Buenos Aires, de los cuales el Viaducto Belgrano Sur, continúa construyéndose y permitirá que esta línea llegue a la terminal de Constitución. El artículo posee como hipótesis que el proyecto podrá concretarse en la medida que sea segmentado: así como una línea de subterráneo –en general- no se construye toda en una única etapa, así tampoco la RER puede plantearse si no es en tramos cortos y con alto beneficio. Para ello, deberá realizarse una priorización sobre la cual se exponen algunos criterios y se propone para la RER del AMBA que el primer tramo a construir sea el que vincule Constitución con la Estación Central del Obelisco y, luego, se continúe con la primera etapa que vinculará las Líneas Roca y San Martín. Esta priorización plantea como objetivo de la etapa 1 el enlace de los corredores metropolitanos Sur y Sudeste con el Noroeste por sobre otras etapas, como lo son las conexiones de las Líneas Sarmiento y Mitre para vincular el corredor Oeste con el Norte y Noroeste (Etapa 2) y la vinculación entre las dos Líneas, Belgrano Norte y Belgrano Sur, las que permitirán la conexión del Corredor Sudoeste con el Noroeste. En todos los casos, las conexiones se materializan bajo el Área Central de la Ciudad Autónoma de Buenos Aires (CABA): con dos Estaciones Centrales, una en el Obelisco (bajo la Avenida 9 de Julio) vinculando los pares Roca - San Martín y ambas líneas del Belgrano en dirección Norte – Sur y la conexión Sarmiento hacia el Río de la Plata (bajo la Avenida Rivadavia y la Avenida de Mayo); y la Estación Central Puerto Madero (frente al edificio de Prefectura Naval) para conectar la Línea Sarmiento con la Mitre en dirección Norte y hacia la Estación Terminal de Retiro. La vinculación de las terminales ferroviarias del área central permitirá que los viajes diarios masivos de periferia al centro puedan penetrar directamente al mismo, eliminando transbordos e interconectando el sistema de transporte masivo del ferrocarril con el subte.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.006
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: none
Teacher disagreement score0.022
Threshold uncertainty score0.051

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0030.006
Meta-epidemiology (narrow)0.0010.000
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0020.001
Science and technology studies0.0010.001
Scholarly communication0.0060.003
Open science0.0010.002
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0150.005

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.005
GPT teacher head0.240
Teacher spread0.234 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2024
Admission routes1
Has abstractyes

Explore more

Same venueRepositorio Digital Institucional de la Universidad de Buenos Aires (Universidad de Buenos Aires)Same topicAdvanced Power Generation TechnologiesFrench-language works237,207