MétaCan
Menu
Back to cohort
Record W7162440845 · doi:10.32628/ijsrce215514

Assessment on Vietnam's Transport Infrastructure Development Investment under the mode of Public-Private Partnership - Proposing Solutions

2021· article· W7162440845 on OpenAlexaff
Le Manh Tuong, Le Hoai Linh, Dang Hoang Tuan, Le Phi Vu

Bibliographic record

VenueInternational Journal of Scientific Research in Civil Engineering · 2021
Typearticle
Language
FieldBusiness, Management and Accounting
TopicPublic-Private Partnership Projects
Canadian institutionsTransport Canada
Fundersnot available
KeywordsInvestment (military)Context (archaeology)Public–private partnershipOrder (exchange)Developing countryForeign direct investmentGovernment (linguistics)Capital (architecture)

Abstract

fetched live from OpenAlex

The goal of developing the country's infrastructure system, especially for underdeveloped or moderately developed countries such as Vietnam is extremely important. To become a modern industrialized country, not only Vietnam but any other countries are required to have an appropriate policy mechanism to strengthen infrastructure, attracting private investment, capital sources while public investment capital remained limited.Solutions to attract investment in infrastructure development in general and transport infrastructure in particular are expected to include perfecting laws, mechanisms and policies, management model. Those will create favorable conditions for domestic and foreign economic sectors to participate in many forms, especially completing the investment under the PPP (Public-Private partnership) model in line with international practices.After nearly 15 years of implementing PPP investment in the construction of transport infrastructure, Vietnam has initially achieved certain results, contributing to the expansion and upgrading of its current transport infrastructure system. Besides public investment capital, government bond capital, official development assistance (ODA), there are sources of investment capital from the non-state sector through PPP project contracts (mainly BOT and BT ones) which have significantly changed the transport infrastructure system in Vietnam (completion of nearly 3,000-km roads of all kinds). In the period of 2021-2025, Vietnam is projected to complete 5,000 km of expressways, in order to create a major economic breakthrough. In the context of limited public investment capital, the PPP investment form is considered the most feasible.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.003
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.026
Threshold uncertainty score0.052

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0020.003
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0010.000
Scholarly communication0.0040.002
Open science0.0000.001
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0060.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.119
GPT teacher head0.364
Teacher spread0.245 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2021
Admission routes1
Has abstractyes

Explore more

Same venueInternational Journal of Scientific Research in Civil EngineeringSame topicPublic-Private Partnership ProjectsFrench-language works237,207