MétaCan
Menu
Back to cohort
Record W2090065501 · doi:10.1115/ipc2008-64154

Application of Dynamic Programming in Long-Range Pipeline Facility Planning and in Assessing Off-Design and Off-Flow-Forecast Trajectories

2008· article· en· W2090065501 on OpenAlexaff
K. K. Botros, Chris Foy, Bill Chmilar

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicWater resources management and optimization
Canadian institutionsTransCanada (Canada)Nova Chemicals (Canada)
Fundersnot available
KeywordsSizingTime horizonRange (aeronautics)Pipeline (software)Computer scienceDynamic programmingOperations researchMathematical optimizationFacility location problemEngineeringMathematics

Abstract

fetched live from OpenAlex

Dynamic programming (DP) inherently provides a methodology for evaluating a series of decisions in order to determine an optimal policy or path forward. The methodology basically enumerates and evaluates alternative states over the planning horizon in formulating the optimum strategy. In the present work, the concept of DP has been applied to pipeline long-range facility planning problems, and further extended to allow evaluation of nth optimum pipeline facility deployments based on cost and/or probabilities of constraints. The best four options were further analyzed considering uncertainties in the cost elements and the resulting economic risk associated with each optimum path. This paper presents the theory behind the extension of the DP methodology to pipeline long-range facility-planning problems over a planning horizon that considers inherent uncertainties in gas supply and demand as well as a range of available facility options. Uncertainties in the size and location of the required facilities to handle the forecast volumes, and associated variances in their respective cost to build and operate the various facilities, are all accounted for. The problem is further complicated by the possible changes in the expected flow from that forecast during design and the resulting penalties associated with the under- or over-sizing of facilities. It was demonstrated that it is important that the off-design flow forecast be evaluated to determine the impact of future variability or changes. The value that the organization can derive from being able to quantify the benefit (or penalty) of forecast uncertainty and over- or under-building long-range facilities, is significant.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.008
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.009
Threshold uncertainty score0.018

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0030.008
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0010.001
Bibliometrics0.0010.002
Science and technology studies0.0010.001
Scholarly communication0.0020.002
Open science0.0010.001
Research integrity0.0010.002
Insufficient payload (model declined to judge)0.0020.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.017
GPT teacher head0.226
Teacher spread0.210 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2008
Admission routes1
Has abstractyes

Explore more

Same topicWater resources management and optimizationFrench-language works237,207