MétaCan
← all works

RETRACTED ARTICLE: Production scheduling of off-site prefabricated construction components considering sequence dependent due dates

2021· article· en· 72 citations· W3199586433 on OpenAlex· 10.1007/s11356-021-16285-0

Why is this work in the frame?

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

Canadian affiliationAn author listed a Canadian institution. This is the only route the usual frame has.

Post-publication record

OpenAlex flags this work as retracted, but it carries no matching Retraction Watch record in this frame.

Abstract

No abstract. This is not a gap in this database — OpenAlex has none either. 23.3% of the frame is in this state, and the screen finds HALF as much metaresearch here, so the absence is a measured bias rather than a missing field.

The record

Venue
Environmental Science and Pollution Research
Topic
BIM and Construction Integration
Field
Engineering
Canadian institutions
École de Technologie SupérieureUniversité du Québec à Montréal
Funders
Keywords
TardinessMetaheuristicComputer scienceScheduling (production processes)Differential evolutionMathematical optimizationJob shop schedulingIndustrial engineeringEngineeringAlgorithmScheduleMathematics
Has abstract in OpenAlex
no