MétaCan
Menu
Cohort builder

4,299,418 works, Canadian by any of four routes.

Every filter state is a URL; the URL is the query; the query is citable via /q/⟨hash⟩. The page, the API and the export parse the same parameters.

The current cohort, streamed from the database: every work column, the machine labels, the provisional scores, and the per-row validation status. Exports are capped at 100,000 rows. Mints a permanent /q/ link for this exact query. The same filters always produce the same link, whoever asks.

Search term
Author
Year range
Sort
Language
Type
Field
Venue
Topic
Power System Reliability and Maintenance
Retraction
Abstract
Evidence source
Study design
Label agreement
Label status

Direct Codex and Gemma labels are unvalidated and sparse. Distilled predictions cover the full frame and are also unvalidated. Choose the evidence source explicitly; absence of a direct label is never a negative label.

affaffiliation
fundfunder
venuejournal
aboutaboutness

The four routes compose: require the funder route and exclude affiliation to get the funder-only stratum no affiliation-based frame ever sees.

594 results · 1 filter active ·
Results by year
20002025
Publication date
Categories
Machine labels · sparse coverage
Evidence
Language
Type
Citations
An unlabeled work is unknown, not a negative. Label coverage is reported on every query.
594 works in the cohort · of 4,299,418page 11 of 12

Labels cover 0 of 594 works in this cohort. The rest are unlabeled, which is not a negative label: the label table is sparse today and grows as labeling rounds land.

Distilled predictions cover 594 of 594 works in this cohort. Predictions are machine_predicted_unvalidated teacher distillation outputs. Candidate is the union; consensus is the intersection.

affno abstractunlabeled
Index
Wenyuan Li
2014· paratext· en· Engineering
distilled prediction:candidate · insufficient_payloadconsensus · insufficient_payload
0
citations
aboutno affunlabeled
Reference Resource Scenario
2002· article· en· Engineering
distilled prediction:candidate · insufficient_payloadconsensus · none
0
citations
afffundunlabeled
Risk assessment of rural diesel generation stations
Wenpeng Luan, Cheong Siew, H. Iosfin
2006· article· en· 2006 IEEE Power Engineering Society General Meeting· Engineering
distilled prediction:candidate · metaepi_narrowconsensus · none
0
citations
aboutno affunlabeled
Preface
2021· article· en· IOP Conference Series Earth and Environmental Science· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
affaboutunlabeled
Modeling rural power quality
D.O. Koval, J.J. Leonard, Z.J. Licsko
2002· article· en· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
affno abstractunlabeled
Reliability Assessment of Cyber-Physical Generation System
Amir Rostami, Mohammad Mohammadi, Hadis Karimipour
2022· article· en· Iranian Journal of Science and Technology Transactions of Electrical Engineering· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
Occurrence Download
2023· dataset· en· Global Biodiversity Information Facility· Engineering
distilled prediction:candidate · metaepi_narrow+insufficient_payloadconsensus · none
0
citations
affno abstractunlabeled
Appendix G: Special Case
David F. Peelo
2019· other· en· Engineering
distilled prediction:candidate · insufficient_payloadconsensus · insufficient_payload
0
citations
aboutno affunlabeled
Asset Risk Management of Electric Power Grids
Niloufar Youssefi
2015· dissertation· en· Spectrum Research Repository (Concordia University)· Engineering
distilled prediction:candidate · metaepi_narrowconsensus · none
0
citations
aboutno affunlabeled
Reliability Compliance
2013· article· en· Engineering
distilled prediction:candidate · insufficient_payloadconsensus · none
0
citations
affno abstractunlabeled
Magnetotelluric Transfer Functions
2013· other· en· NSF Seismological Facility for the Advancement of Geoscience (SAGE)· Engineering
distilled prediction:candidate · metaepi_narrow+insufficient_payloadconsensus · none
0
citations
affunlabeled
BC hydro strategy for replacement of equipment
H. Iosfin
2009· article· en· Electricity Distribution - Part 2, 2009. CIRED 2009. The 20th International Conference and Exhibition on· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
Appendix 1: The Electricity Market
Wholesale Market Operations
2008· article· en· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
affno abstractunlabeled
Resilience of Transmission Systems
Yujia Li, Chenxi Hu, Yixuan Chen, Junhong Liu, Chong Wang, Rong-Peng Liu +1 more
2025· book-chapter· en· Power electronics and power systems· Engineering
distilled prediction:candidate · metaepi_narrowconsensus · none
0
citations
affunlabeled
Introduction
Wenyuan Li
2014· other· en· Engineering
distilled prediction:candidate · insufficient_payloadconsensus · insufficient_payload
0
citations

How this was built: Screen · Findings · About