MétaCan
Menu
Cohort builder

4,299,418 works, Canadian by any of four routes.

Every filter state is a URL; the URL is the query; the query is citable via /q/⟨hash⟩. The page, the API and the export parse the same parameters.

The current cohort, streamed from the database: every work column, the machine labels, the provisional scores, and the per-row validation status. Exports are capped at 100,000 rows. Mints a permanent /q/ link for this exact query. The same filters always produce the same link, whoever asks.

Search term
Author
Year range
Sort
Language
Type
Field
Venue
Topic
Structural Engineering and Vibration Analysis
Retraction
Abstract
Evidence source
Study design
Label agreement
Label status

Direct Codex and Gemma labels are unvalidated and sparse. Distilled predictions cover the full frame and are also unvalidated. Choose the evidence source explicitly; absence of a direct label is never a negative label.

affaffiliation
fundfunder
venuejournal
aboutaboutness

The four routes compose: require the funder route and exclude affiliation to get the funder-only stratum no affiliation-based frame ever sees.

1,067 results · 1 filter active ·
Results by year
20002025
Publication date
Categories
Machine labels · sparse coverage
Evidence
Language
Type
Citations
An unlabeled work is unknown, not a negative. Label coverage is reported on every query.
1,067 works in the cohort · of 4,299,418page 13 of 22

Labels cover 0 of 1,067 works in this cohort. The rest are unlabeled, which is not a negative label: the label table is sparse today and grows as labeling rounds land.

Distilled predictions cover 1,067 of 1,067 works in this cohort. Predictions are machine_predicted_unvalidated teacher distillation outputs. Candidate is the union; consensus is the intersection.

aboutno affunlabeled
Lions' Gate Bridge Suspended Span Replacement
Darryl D. Matson
2009· article· en· 2009 ANNUAL CONFERENCE AND EXHIBITION OF THE TRANSPORTATION ASSOCIATION OF CANADA - TRANSPORTATION IN A CLIMATE OF CHANGE· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
Building No.8 (Royal Canadian Corps of Signals)
nanook
2019· dataset· en· Zenodo (CERN European Organization for Nuclear Research)· Engineering
distilled prediction:candidate · insufficient_payloadconsensus · insufficient_payload
0
citations
aboutno affunlabeled
Bridge Plate
RubenHJ
2019· dataset· en· Zenodo (CERN European Organization for Nuclear Research)· Engineering
distilled prediction:candidate · metaepi_narrow+insufficient_payloadconsensus · insufficient_payload
0
citations
aboutno affunlabeled
Bridge Plate
RubenHJ
2019· dataset· en· Zenodo (CERN European Organization for Nuclear Research)· Engineering
distilled prediction:candidate · metaepi_narrow+insufficient_payloadconsensus · insufficient_payload
0
citations
aboutno affunlabeled
Lantern at High Level Bridge, Hamilton, Ontario
wmacphail
2021· dataset· en· Zenodo (CERN European Organization for Nuclear Research)· Engineering
distilled prediction:candidate · metaepi_narrow+insufficient_payloadconsensus · insufficient_payload
0
citations
aboutno affunlabeled
Building No.8 (Royal Canadian Corps of Signals)
nanook
2019· dataset· en· Zenodo (CERN European Organization for Nuclear Research)· Engineering
distilled prediction:candidate · insufficient_payloadconsensus · insufficient_payload
0
citations
aboutno affunlabeled
Lantern at High Level Bridge, Hamilton, Ontario
wmacphail
2021· dataset· en· Zenodo (CERN European Organization for Nuclear Research)· Engineering
distilled prediction:candidate · metaepi_narrow+insufficient_payloadconsensus · insufficient_payload
0
citations
aboutno affunlabeled
The New Samuel De Champlain Bridge
Marwan Nader
2022· article· en· Hormigón y Acero· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
ALL HANDS ON DECK
H Russell
2001· article· en· Bridge design & engineering· Engineering
distilled prediction:candidate · metaepi_narrowconsensus · none
0
citations
affaboutunlabeled
Conceptual Design of an Aluminium Bridge in Alma, QC
László Gergely Vigh, Gábor Schnierer, Judit Buchmüller, Ákos Pohl, Bence Turányi, László I. Kiss +2 more
2016· article· en· Key engineering materials· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
affunlabeled
[no title]
William R. Morrison, Tracy Heather Strain, Randall MacLowry
2005· article· en· Journal of American History· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
A golden bridge for eagles
P Selby Smith
2009· article· fr· World Highways/Routes du Monde· Engineering
distilled prediction:candidate · metaepi_narrowconsensus · none
0
citations
aboutno affunlabeled
Route 1 Gateway Project - New Brunswick's Latest Challenge
H Varjabedian, D Clowater
2012· article· en· 2012 CONFERENCE AND EXHIBITION OF THE TRANSPORTATION ASSOCIATION OF CANADA - TRANSPORTATION: INNOVATIONS AND OPPORTUNITIES· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
affno abstractunlabeled
Building Bridges
2025· article· Canada Watch· Engineering
distilled prediction:candidate · metaepi_narrowconsensus · none
0
citations
aboutno affunlabeled
Infrastructure Engineering Option in Engineering Science
Matthew J. Roorda
2013· article· en· 2013 CONFERENCE AND EXHIBITION OF THE TRANSPORTATION ASSOCIATION OF CANADA - TRANSPORTATION: BETTER - FASTER - SAFER· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
affaboutunlabeled
Burlington Bay Skyway Hanger Fail-Safe System
Konstantinos Kris Mermigas, Martin Krall, E. C. M. Parsons
2019· article· en· Report· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations

How this was built: Screen · Findings · About