MétaCan
Menu
Cohort builder

4,299,418 works, Canadian by any of four routes.

Every filter state is a URL; the URL is the query; the query is citable via /q/⟨hash⟩. The page, the API and the export parse the same parameters.

The current cohort, streamed from the database: every work column, the machine labels, the provisional scores, and the per-row validation status. Exports are capped at 100,000 rows. Mints a permanent /q/ link for this exact query. The same filters always produce the same link, whoever asks.

Search term
Author
Year range
Sort
Language
Type
Field
Venue
Railway track and structures
Topic
Retraction
Abstract
Evidence source
Study design
Label agreement
Label status

Direct Codex and Gemma labels are unvalidated and sparse. Distilled predictions cover the full frame and are also unvalidated. Choose the evidence source explicitly; absence of a direct label is never a negative label.

affaffiliation
fundfunder
venuejournal
aboutaboutness

The four routes compose: require the funder route and exclude affiliation to get the funder-only stratum no affiliation-based frame ever sees.

26 results · 1 filter active ·
Results by year
20002014
Publication date
Categories
Machine labels · sparse coverage
Evidence
Language
Type
Citations
An unlabeled work is unknown, not a negative. Label coverage is reported on every query.
26 works in the cohort · of 4,299,418page 1 of 1

Labels cover 0 of 26 works in this cohort. The rest are unlabeled, which is not a negative label: the label table is sparse today and grows as labeling rounds land.

Distilled predictions cover 26 of 26 works in this cohort. Predictions are machine_predicted_unvalidated teacher distillation outputs. Candidate is the union; consensus is the intersection.

aboutno affunlabeled
BRIDGE DECK FASTENER EVALUATION AT FAST
Duane Otter, Brian Doe
2005· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
1
citations
aboutno affunlabeled
TORONTO SQUEEZES IN NEW SUBWAY LINE
Tracey Budd, W. Raymond Duncan, T Lee
2004· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
When Winter Comes Calling
Mischa Wanek-Libman
2014· article· en· Railway track and structures· Environmental Science
distilled prediction:candidate · insufficient_payloadconsensus · none
0
citations
aboutno affunlabeled
"Generic" Commuter Wheel-Rail Profiles
Eric Magel, Ali Tajaddini
2005· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
GRINDING TAKING ON NEW PROFILE
Kazuo Matoba
2000· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
DEALING WITH M/W UNDER HEAVY HAUL
T Judge
2000· article· en· Railway track and structures· Business, Management and Accounting
distilled prediction:candidate · insufficient_payloadconsensus · none
0
citations
aboutno affunlabeled
Optimizing Winter Speed Restrictions
Yan Liu, Chris Ladubec, J. Preston–Thomas, Eric Magel, M D Roney
2008· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
RAIL GRINDING ON CN
K Sawley, John Robinson
2000· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
Building the Energy Boom
Mischa Wanek-Libman
2013· article· en· Railway track and structures· Business, Management and Accounting
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
Expanding Canadian National's Kirk Yard
Jennifer Núñez
2014· article· en· Railway track and structures· Business, Management and Accounting
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
RAILROADS COMMITTED TO ENVIRONMENT
T Judge
2002· article· en· Railway track and structures· Business, Management and Accounting
distilled prediction:candidate · insufficient_payloadconsensus · none
0
citations
aboutno affunlabeled
ADVANCES IN RAIL GRINDING
M D Roney
2002· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
Expansion Fuels: GO Transit’s Future
Mischa Wanek-Libman
2014· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
TTC STREAMLINES M/W PLANNING
T Lee, Allan M. Zarembski, J Weisgerber
2002· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
BRIDGES REQUIRE TLC
T Judge
2002· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
RAILROAD M/W BUDGETS TRENDING UPWARD
T Judge
2004· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
A CLOSER LOOK AT HIGH-CARBON RAIL
T Judge
2004· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
CPR CONTRACTOR NET BOOSTS RESPONSE TIME
T Judge
2001· article· en· Railway track and structures· Business, Management and Accounting
distilled prediction:candidate · insufficient_payloadconsensus · none
0
citations
aboutno affunlabeled
OPTIMIZING THE SYSTEM ON CPR'S BC SOUTH LINE
M D Roney, D K Meyler, Eric Magel, P Sroba
2001· article· en· Railway track and structures· Engineering
distilled prediction:candidate · noneconsensus · none
0
citations
aboutno affunlabeled
Railroads Continue Big Spending on M/W
T Judge
2007· article· en· Railway track and structures· Business, Management and Accounting
distilled prediction:candidate · noneconsensus · none
0
citations

How this was built: Screen · Findings · About