MétaCan
Menu
Cohort builder

4,299,418 works, Canadian by any of four routes.

Every filter state is a URL; the URL is the query; the query is citable via /q/⟨hash⟩. The page, the API and the export parse the same parameters.

The current cohort, streamed from the database: every work column, the machine labels, the provisional scores, and the per-row validation status. Exports are capped at 100,000 rows. Mints a permanent /q/ link for this exact query. The same filters always produce the same link, whoever asks.

Search term
Author
Year range
Sort
Language
Type
Field
Venue
Topic
BIM and Construction Integration
Retraction
Abstract
Evidence source
Study design
Label agreement
Label status

Direct Codex and Gemma labels are unvalidated and sparse. Distilled predictions cover the full frame and are also unvalidated. Choose the evidence source explicitly; absence of a direct label is never a negative label.

affaffiliation
fundfunder
venuejournal
aboutaboutness

The four routes compose: require the funder route and exclude affiliation to get the funder-only stratum no affiliation-based frame ever sees.

1,860 results · 1 filter active ·
Results by year
20002025
Publication date
Categories
Machine labels · sparse coverage
Evidence
Language
Type
Citations
An unlabeled work is unknown, not a negative. Label coverage is reported on every query.
1,860 works in the cohort · of 4,299,418page 16 of 38

Labels cover 5 of 1,860 works in this cohort. The rest are unlabeled, which is not a negative label: the label table is sparse today and grows as labeling rounds land.

Distilled predictions cover 1,860 of 1,860 works in this cohort. Predictions are machine_predicted_unvalidated teacher distillation outputs. Candidate is the union; consensus is the intersection.

venueno affunlabeled
Identification of Risk Factors in Business Valuation
Muhammad Najib Razali, Rohaya Abdul Jalil, Kamalahasan Achu, Hishamuddin Mohd Ali
2022· article· en· Journal of risk and financial management· Engineering
distilled prediction:candidate · noneconsensus · none
4
citations
affunlabeled
Hybrid Constructions
Kay Koppedrayer
2004· article· en· Religious Studies and Theology· Engineering
distilled prediction:candidate · noneconsensus · none
4
citations
afffundvenueunlabeled
Automation of Quantity Take-off for Modular Construction
Hongru Zhao, Hexu Liu, Mohamed Al‐Hussein
2015· article· en· Modular and Offsite Construction (MOC) Summit Proceedings· Engineering
distilled prediction:candidate · metaepi_narrowconsensus · none
4
citations
affvenueunlabeled
Optimization of earthworks planning: a systematic mapping study
Pedro Guilherme Pinheiro Santos Fernandes, Ernesto Ferreira Nobre Júnior, Bruno de Athayde Prata
2022· article· en· Canadian Journal of Civil Engineering· Engineering
distilled prediction:candidate · noneconsensus · none
4
citations
affunlabeled
Industry 4.0 and BIM: Do They Share the Same Objectives?
Laurent Joblot, Christophe Danjou, Robert Pellerin, Samir Lamouri
2021· book-chapter· en· Lecture notes in mechanical engineering· Engineering
distilled prediction:candidate · metaepi_narrow+research_integrityconsensus · research_integrity
4
citations
affunlabeled
Acquisition And Modeling Of Conceptual Structural Design Knowledge
Steve Parent, Hugues Rivard, Rodrigo Mora
2006· article· en· Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June· Engineering
distilled prediction:candidate · noneconsensus · none
4
citations
affno abstractunlabeled
Life Cycle Cost Analysis
Sami Chatti, Luc Laperrière, Gunther Reinhart, Tullio Tolio
2019· book-chapter· en· Engineering
distilled prediction:candidate · insufficient_payloadconsensus · insufficient_payload
4
citations

How this was built: Screen · Findings · About